2.2 Typical Workflow

This is the usual path to build, verify and simulate a distribution network with QGISRed.


Step 1 β€” Create or open the project#

Use the General bar to get started:

  • New project from scratch: Create project β†’ choose name, folder and reference system. QGISRed automatically generates the 6 base SHPs (Junctions, Pipes, Tanks, Reservoirs, Valves, Pumps).
  • Existing project: Project manager β†’ double click on the project in the recent list.
  • From an EPANET file: Import project β†’ select the .inp. QGISRed converts it to SHP and opens it.

Step 2 β€” Configure project options#

From the Project bar, access Project Options to define:

  • Flow units (LPS, GPM, CMH…)
  • Head loss formula (D-W, H-W, C-M)
  • Quality Model (None, Chlorine, Age, Tracer)

The indicator on the main bar (LPS | D-W) always reflects the active values.

Step 3 β€” Build the network#

Activate the Edition bar and draw the network on the map:

  1. Start with the pipes β€” the extreme nodes create themselves.
  2. Add tanks and reservoirs by clicking on existing nodes.
  3. Insert valves and pumps by clicking on a pipe.
  4. Edit the properties of each element (diameter, roughness, dimension, demand...).

πŸ’‘ You can import existing geometry (infrastructure SHP, background orthophoto) and plot the network on top of it.

Step 4 β€” Check model quality#

Before simulating, use the Debug bar:

  1. Consolidate and review data β€” detects incomplete or inconsistent attributes.
  2. Verify connectivity β€” identifies isolated areas without a pressure source.
  3. Hydraulic sectors β€” check the power supply to each sector.

Correct any problems noted in the incident report before continuing.

Step 5 β€” Prepare demand data#

From the Tools bar:

  • Interpolate elevations if the nodes do not have elevations assigned.
  • Assign roughness based on material and installation date.
  • Nodal demand builder to distribute consumption.

Step 6 β€” Simulate#

From the Analysis bar:

  1. Analysis options β€” check the duration and time step.
  2. Run model β€” the simulation can take from one second to several minutes depending on the size of the network.
  3. When finished, QGISRed automatically loads the result layers and opens the Results Viewer.

Step 7 β€” Explore results#

In the side panel of the Results Viewer:

  • Select which variable to show in nodes (Pressure, Demand, Quality) and in pipes (Flow, Velocity, Unit Loss...).
  • Move the time slider to see the evolution throughout the simulated period.
  • Activate Map Notices to read values ​​when you mouse over any element.
  • Use Time Series to graph the evolution of a specific point.

Step 8 β€” Save#

  • Save Map saves the QGIS project (.qgz) with the visible layers and styles.
  • Export project (from the Project Manager) generates a portable ZIP of the project.

❗ IMPORTANT: QGISRed does not modify the layers while they are in Edit Mode of QGIS. Be sure to commit (Ctrl+S on the layer) or discard your changes before using any plugin tools.